NMC has had a new sidewalk installed on main campus that goes around the West Hall construction area, which will be fully fenced off after the September 24 groundbreaking ceremony. The temporary sidewalk starts directly between East and West halls and cuts across the grass to the long east-west sidewalk that connects the Health & Science Building to the Oleson Center.